How are we handling the transmission problems for renewable energy?



  1. 0 Votes

    Great question – transmission is often cited as the biggest barrier to increasing renewables.  In CA, the Renewable Energy Transmission Initiative is currently working to find the best places to build transmission to maximize the amount of renewables from these resource rich areas.  The National Renewable Energy Lab is currently conducting several integration studies including a wide scale wind systems integration studyy.  Several states are also exploring the feasibility of and several states are conducting feasibility and integration studies.